Energy & grid logistics · Project kitting · English
Energy & grid equipment logistics —
ready when the project calls.
Europe is rebuilding its grid, and the equipment makers supplying that build-out — switchgear, transformers, cabling, renewable components — need a logistics partner who understands project logistics, not just pallet in / pallet out. RT Global Solution provides warehousing, project kitting and staged deliveries for energy & grid equipment manufacturers from our French platforms, with the references to prove it.
What project logistics means here
Project kitting. We receive components from your plants and suppliers, consolidate them into installation-ready kits — one substation bay, one wind-farm delivery, one retrofit package — and release them to the construction schedule, not to a warehouse convenience. A missing bracket on site costs a crew day; our kitting discipline exists to prevent exactly that.
Long-tail inventory for service & maintenance. Grid operators keep equipment running for decades. We store slow-moving spare parts with batch traceability and same-day release for emergency call-outs, so your service contracts hold their SLA.
Heavy, long and awkward. Cable drums, busbars, structural elements: adapted racking, handling equipment and securing methods (NIMP 15 export packaging available for overseas shipments).
Import & export gateway. Miramas, 20 minutes from the Port of Fos-Marseille, receives your ocean-freight components from Asia and stages them for European project sites; Lyon-corridor platforms cover national and cross-border distribution J+1.
⚡ Trusted by the energy sector
Energy & grid equipment makers — including GE Vernova — count on RT platforms for their French operations. References and contact details available on request; verifiable claims only. And your ESG teams get audit-ready carbon data (GLEC v3 / ISO 14083) on every flow — see how →
Frequently asked questions
Can you synchronise deliveries with a construction schedule?
Yes — that is the core of our project logistics model: kits are built and held, then released against your site milestones, with delivery windows agreed with the installation crews. Changes in the schedule reflow the release plan, not the warehouse.
Do you handle dangerous goods for energy applications?
Yes — ADR classes 2, 3, 8 and 9, including lithium-ion battery storage for stationary energy storage systems, with a dedicated ADR safety adviser and segregated, compliant zones.
Can you act as our European base for equipment made in the US or Asia?
Yes. Ocean arrival via Fos-Marseille (3-5 days shorter from Asia than Northern-range ports for Southern Europe), bonded and duty-management options, then staged distribution to project sites across the EU. See our European distribution gateway page for the full setup.
Tell us about your project pipeline.
Component profile, volumes, project geography — structured feasibility answer within one week, in English.